Wangshan Qingshui Water Treatment Plant
ARCHITECTS
POA Architects
LEAD ARCHITECT
Chengshou Pan
DESIGN TEAM
Jason L, Ruihua Zheng, Ziyu Lin, Qiang Xiao, Xinran Wang
CONSTRUCTION
Zhejiang No. 2 Construction Group Co., LTD.
DESIGN INSTITUTE
North China Municipal Engineering Design & Research Institute Co., LTD.
CLIENT
Cangnan Water Affairs Group Co., LTD.
AREA
13080 m²
YEAR
2026
LOCATION
Wenzhou, China
CATEGORY
Industrial Architecture, Sustainability
English description provided by the architects.
Wangshan Qingshui Water Treatment Plant stands in Qianku, Cangnan County, Wenzhou, where housing, cultivated land and river channels meet.
With architectural scheme design by POA Architects, the facility brings treatment basins, production buildings and connecting spaces into a legible above-ground ensemble.
Elongated basins occupy the center of the site. Buildings of different dimensions stand around them, while roof profiles, rectangular openings, metal screens and glazed surfaces give the group a shared architectural language.
Gaps between the buildings establish smaller outdoor spaces within the larger production campus. The central basins remain visible as a defining part of the composition.
The relationship between production and movement is particularly apparent at the basin edges. Raised passages and bridge crossings place circulation close to the treatment structures.
Planted paths occupy another layer at ground level. Their juxtaposition brings the scale of the infrastructure into a direct relationship with the experience of walking through the plant.
Inside the treatment hall, repeated structural bays, basins, pipework and access platforms establish the working environment.
Together, the exterior and interior views show how the facility is encountered at different scales during everyday work.
The administration and support building faces Longjin Avenue with a glazed frontage and an extended roof profile. A courtyard introduces an inward-facing space within the long volume.
The plans identify control, laboratory, administration and support functions; the sections describe the relationship between occupied floors, the roof and the adjacent treatment basins.
The low-rise group has a distinct presence against the neighboring residential towers. Views from cultivated land place agriculture, new housing and water infrastructure in the same frame.
The river and planted site edges give this regional facility a specific setting within the changing environment of a county town.
Wenzhou Daily reported on 13 October 2026 that the plant had passed completion acceptance and moved from trial to formal operation.
The report gives a water-supply capacity of 120,000 tonnes per day and an intended service population of nearly 300,000 across five towns.
The project offers a built case for discussing how the architecture of a drinking-water facility can make production spaces understandable while accommodating daily work and responding to the surrounding settlement.



























