ARCHITECTS
Atelier d'Architecture A4, P&P Architectes
TECHNICAL TEAM
Sofiane Amalou, Guy Mouton
LEAD TEAM
Arnaud De Lanève, Michel Arnoldussen, Michel Arickx
DESIGN TEAM
Aurélie Bruguet Moreau, Lionel Philipperon
ARCHITECTURE OFFICES
P&p Architectes, Atelier D'architecture A4
ENGINEERING & CONSULTING > STRUCTURAL
Tractebel
ENGINEERING & CONSULTING > OTHER
Tractebel
GENERAL CONTRACTOR
Artesgroup & J.delens
MANUFACTURERS
Sto, Batisteel, Fabribois, Knauf , Pierret, VMZINC, Winerberger
PHOTOGRAPHS
Nicolas Da Silva Lucas
AREA
14230 m²
YEAR
2025
LOCATION
Bruxelles, Belgium
CATEGORY
Residential Architecture, Apartments, Renovation
English description provided by the architects.
Winner of the Be-Exemplary Award 2019, Vandeuren III and IV is part of an ambitious renovation strategy for social housing in Brussels.
The project transforms 160 dwellings into 132 reconfigured units while integrating shared facilities and a reorganization of outdoor spaces.
The intervention combines heritage preservation, quality of use, and circularity, enhancing the existing fabric while responding to contemporary needs.
The project concerns seven of the thirteen buildings of the Vandeuren housing estate, designed between 1928 and 1935 by Joseph Caluwaert.
Characterized by an eclectic style, these buildings feature refined front façades and sober yet harmonious rear elevations.
This homogeneity, rare in Brussels, guided the intervention: restoring and enhancing the ensemble while adapting the dwellings to current standards.
The design balances conservation and transformation, limiting demolition and optimizing circulation and natural light.
Block III presents a coherent ensemble of buildings from the same period. The project allowed this ensemble to be enhanced and its original character restored.
On the rear façades, new balconies, metal terraces, and recessed rooftop extensions strengthen habitability without compromising the original aesthetics.
Block IV, on the other hand, is embedded in a heterogeneous environment that has already been partially renovated.
It adopts a contemporary architectural language through the use of white glazed ceramic tile cladding, in dialogue with the white façades renovated during earlier phases by the MDW architecture office.
This approach creates a homogeneous landscape visible from the surrounding dwellings. Black metal balconies are added to provide each unit with high-quality outdoor space.
On the ground floor, the dwellings benefit from terraces protected by carefully integrated vegetation.
Beyond the renovation of the buildings, both blocks have been reimagined as lively spaces open and permeable to the neighborhood.
Enclosed gardens give way to open circulation paths, encouraging soft mobility and urban interaction. Programmatic diversity further enriches this dynamic:
a laundry room, a digital space, a homework school, and the historic cultural hall "La Goutte de Lait," which regains its original function.
Resource and energy management aims for a reasoned reduction of needs, with particular attention to the most vulnerable households.
Greening strategies and green roofs enhance biodiversity, while rainwater is managed in the open through swales, infiltration basins, and dry riverbeds.
Vandeuren III–IV goes beyond the environmental dimension to fully embrace social and urban challenges.
The block becomes a framework for mobility, services, and conviviality, articulating constructive memory with contemporary needs.
The project demonstrates how rehabilitation can sustainably reinvent social housing, reconciling heritage, habitability, and sustainability in a sensitive dialogue with the urban fabric.












































