Kresge College Expansion at University of California
ARCHITECTS
Studio Gang
STRUCTURAL ENGINEER
Magnusson Klemencic Associates
STRUCTURAL ENGINEER
MME Civil + Structural Engineering
INTERIOR DESIGNER
Studio Gang
CIVIL ENGINEER
Sherwood Design Engineers
MEPFP
Introba
LANDSCAPE ARCHITECT
Joni L Janecki and Associates Landscape Architects, Office of Cheryl Barton
LIGHTING CONSULTANT
Horton Lees Brogden Lighting Design
ACOUSTIC CONSULTANT
Salter
QUANTITY SURVEYOR
Directional Logic
ELEVATOR CONSULTANT
Elevator Consulting Associates
LEAD DESIGNER
Jeanne Gang
PRINCIPAL IN CHARGE
Steve Wiesenthal
PROJECT LEADER
Claire Halpin
ASSOCIATE ARCHITECT
TEF Design
KEY TEAM MEMBERS
Molly Kinsella, Ashley Hinton, David Swain, Rolf Temesvari, Corbin Keech, Elizabeth Nadai, Adriana Arteaga, Chase Jordan, Kristina Eldrenkamp, Nicholas Cecchi, Olesya Vodenicharska, Dimitra Gelagoti, Alexandra Bair, Michael Nham, Jordan Hicks, Emily Licht, AJ Rosales, Wei-Ju Lai, William Emmick, Mark Schendel, and Margaret Cavenagh.
SUSTAINABILITY CONSULTANT
Atelier Ten
ENVELOPE CONSULTANT
Simpson Gumpertz & Heger
WAYFINDING AND GRAPHICS
Cheng+Snyder
CODE CONSULTANT
Holmes Fire
ACCESSIBILITY CONSULTANT
Jensen Hughes
TECHNOLOGY CONSULTANT
TEECOM
THEATER CONSULTANT
The Shalleck Collaborative
FOOD SERVICE CONSULTANT
Ricca Design Studios
GENERAL CONTRACTOR
Swinerton Builders
PHOTOGRAPHS
Jason O'Rear
AREA
37000 ft²
YEAR
2023
LOCATION
Santa Cruz, United States
CATEGORY
University, Dorms
English description provided by the architects.
Studio Gang, the international architecture and urban design firm led by Jeanne Gang, has completed an expansion of Kresge College at the University of California, Santa Cruz (UCSC).
The firm's expansion plan involves the construction of four new buildings–three mass-timber residential halls and the new Kresge College Academic Center – as well as improvements to the site that increase the College's accessibility and better connect it with the surrounding natural ecology and the greater UCSC campus.
The expansion's new buildings create a playful dialogue with Kresge College's original design, completed in 1973 by Charles Moore and William Turnbull of Moore, Lyndon, Turnbull, and Whitaker.
Organic features, such as curvilinear forms, natural materials, and porous spaces, complement Moore and Turnbull's angular buildings.
The expansion also reinforces the College's founding theme of 'participatory democracy' by layering in various scales of open spaces that can be used for individual and group activity, ranging from personal reflection and respite to social gatherings and community events.
"Our goal was to add new qualities to the sense of place offered by Moore and Turnbull's design, rather than to replicate the architecture," says Jeanne Gang, Founding Principal and Partner of Studio Gang.
"We wanted our expansion to retain the qualities of surprise and free-spiritedness that have defined Kresge College, while at the same time opening it up to students of all abilities, the incredible natural ecology of its site, and the larger university community beyond."
The 37,000-sf Kresge College Academic Center houses new classrooms, academic offices, faculty meeting spaces, and conference rooms. It also hosts a 600-seat lecture hall, the largest of its kind on UCSC's campus.
The building, which occupies a ridge between two ravines, negotiates the steep slope by employing a technique common to polypore fungi: simultaneously stepping down the slope and flaring out.
Adopting this strategy allows the relatively large building to stay in scale with its neighbors at the upper street level while bringing natural light and fresh air to the lower floors.
The three new residential buildings, meanwhile, respond to the pressing need for more student housing across Santa Cruz today by adding over 400 beds for students.
Extending the social space of the adjacent pedestrian street, the ground floor of each building is designed around shared amenities, including lounges and a new café, where students can come together in a visually open and welcoming environment.
The new buildings, which are among the first cross-laminated timber buildings constructed in California, work with the natural features of the site to reduce their carbon footprint.
The buildings bend around significant groves and nestle into the existing topography to minimize the removal of redwood trees and maximize shade from the canopy that reduces cooling loads.
The buildings also feature bird-safe glass to protect the biodiverse life of the forest; Studio Gang designed custom fritting that features twelve different animal species found on the site, including the banana slug - UCSC's mascot.
Further, the design rehabilitates and expands Kresge's historic runnel system to allow circulation pathways to work with the site's topography and ecology to direct, capture, and filter stormwater for reuse.
Studio Gang's expansion also restores and creates new pedestrian paths that make Kresge College fully accessible to today's standards and provide wheelchair accessibility for the first time in its history.
The rehabilitation of an existing ravine bridge further increases accessibility and provides more welcoming connections to the rest of the UCSC campus while preserving views of surrounding redwood trees.
Underscoring Kresge College's tenet of participatory democracy, Studio Gang engaged extensively with the students, faculty, staff, alumni, and Santa Cruz residents throughout the 18-month planning phase for the expansion as well as subsequent design phases. This process included regular town halls, committee meetings, and other informal engagements where the design team sought feedback on design progress.
Construction on Studio Gang's expansion began in 2019, and the new buildings opened to students, faculty, and staff for the Fall 2023 semester. The completed expansion emerged from a campus plan that Studio Gang developed in 2019.
In addition to the four new buildings, this plan also proposed strategies for the renewal of the original buildings and smaller structures like the well-loved Mayor's Stand and a preliminary design of a new Town Hall. A second phase of work on Kresge College, a design-build project by Truebeck Construction and EHDD, is also underway and is expected to be completed in 2025.