U.S. Embassy Guatemala City
ARCHITECTS
The Miller Hull Partnership
MANUFACTURERS
Decoustics, Architectural Stone Imports, Daltile
LEAD ARCHITECTS
David Miller
CLIENT
U.s. Department Of State Bureau Of Overseas Buildings Operations (Obo)
CONTRACTOR
Bl Harbert International
CIVIL AND STRUCTURAL ENGINEER
Magnusson Klemencic Associates
ARCHITECTS
Cory Mattheis, Chris Grammens, Maaike Post, Sean Waldron, Jayme Van Oot, Jim Hanford, Eric Nothdurft, Whitney Pierce, Michelle Petersen,
LANDSCAPE ARCHITECT
Knot Studio
INTERIOR DESIGN
Integrus Architecture
GEOTECHNICAL ENGINEER
Schnabel Engineering
PARTNER IN CHARGE / ARCHITECT
Rob Misel
PROJECT MANAGER / ARCHITECT
Mathew Albores
DESIGNER
Matthew Kikosicki
LOCAL ARCHITECT
Paredes + Aleman
AREA
24300 M²
SECURITY CONSULTANT
Hinman Consulting Engineers
MECHANICAL, ELECTRICAL & PLUMBING ENGINEER
Interface Engineering
YEAR
2022
LOCATION
Guatemala
CATEGORY
Embassy
Located nine kilometers southeast of the city’s historic center, the new U.S. Embassy in Guatemala City consists of an 18,800-square-meter chancery building and support buildings with a below-grade garage.
Working in collaboration with the Department of State’s Bureau of Overseas Buildings Operations (OBO) and the design-build team at B.L.
Harbert International and Page, The Miller Hull Partnership’s design emphasizes the important diplomatic relationship between the United States and Guatemala and provides a first impression of the United States for many Guatemalans planning to visit the country.
The Embassy is situated on a relatively small, steeply sloping lot, surrounded by a mountain valley and deep forested ravines.
Using an innovative terracing method to stabilize the extreme topography and organize the site, the design team was able to integrate the campus program while providing generous outdoor gardens for both visitors and staff.
The office building emerges from the ground plane as two complementary bars, a stone base, and a glass tower.
The base reflects an earthbound quality through its materiality and relationship to the site while the tower is characterized by openness and transparency.
The conceptual form is reflective of the two countries, the stone base is inspired by Maya architecture and transforms into a light and airy tower to symbolize the optimistic, diplomatic relationship between Guatemala and the United States.
Communal programs surround a courtyard at the intersection of the tower and base, which forms the heart of the building.
A generous plaza and consular garden are shaded and protected by canopies, providing a hospitable waiting area for a large volume of consular visitors.
The new Embassy is located next to several significant green spaces including the Parque Ecologico Jacarandas de Cayala and Parque Ecologico y Deportivo Cayala.
The design creates significant areas of forest and native vegetation that link to these spaces, providing water recharge, protection against natural disasters, and shelter for biodiversity.
Targeted to exceed the Federal Performance Goals for energy efficiency and renewable energy, the Embassy reduces energy consumption by 26.5% over a comparable new building and provides 9% of the new office building’s energy consumption with solar photovoltaics.
The Embassy is designed to reduce offsite flows by treating and reusing wastewater onsite, all irrigation water is supplied by this reclaimed resource.
Additionally, the Embassy will match existing pre-development stormwater runoff flows using detention tanks which slow the release of water, mitigating risk to water quality and adjacent slope stability.