Denton Corker Marshall

Binus Edupark Semarang

Binus Edupark Semarang
© ATMODJO

BINUS EDUPARK SEMARANG

Denton Corker Marshall

LEAD ARCHITECTS
Budiman Hendropurnomo, Dicky Hendrasto

CONTRACTORS
Pt Total Bangun Persada

PROJECT ARCHITECT
Daniel Ade Christianto, Kevin Oscar

MANUFACTURERS
Sika, Bluescope, Gaf, Kend Jaya, Knauf, Mowilex, Poetri Roster, Roman Tiles, Sigma, Seven, Toto, Venus Tiles

STRUCTURE ENGINEER
Pt Perkasa Carista Estetika

QUANTITY SURVEYOR
Pt Reynolds Partnership

PHOTOGRAPHS
Atmodjo

AREA
15000 m²

MEP & HVAC
Pt Policipta

YEAR
2021

LOCATION
Indonesia

CATEGORY
Schools

Binus Edupark Semarang
© ATMODJO

Binus School is the first public facility provided by the new town called POJ – Pearl of Java (400 – 500 hectares). It is seed development for future inhabitants.

Binus Edupark Semarang
© ATMODJO
Binus Edupark Semarang
© ATMODJO

Currently, Binus University is also established using some of the high school buildings to cater to older age groups. Meanwhile, the Binus University campus is also being built for operation in 2024.

Binus School is designed as a series of seashell-like forms. Being carried by the waves onshore and scattered on an elevated sandy platform by the beach and flood canal.

Binus Edupark Semarang
© ATMODJO
Binus Edupark Semarang
© ATMODJO

When the campus will be surrounded completed by coastal gardens to provide shading and encourage wild birds and other wildlife to come back to their coastal area.

Natural ventilation Is controlled by the secondary skin of a red terracotta breeze block made of earth in Java.

Binus Edupark Semarang
© ATMODJO
Binus Edupark Semarang
© ATMODJO

The curvy linear shell-like buildings allow the sea breeze to move in between the classrooms in a streamlined manner with no turbulence.

Open-air sporting facilities enjoy the sea breeze from north to south.

Binus Edupark Semarang
© ATMODJO
Binus Edupark Semarang
© ATMODJO

Initially, all roofs of Binus School are covered by plants but due to poor soil conditions of the original marshland, the structural foundation only allows us to establish a smaller position of the green roof in the campus.

The school has just opened, so we have no numerical data yet.

Binus Edupark Semarang
© ATMODJO
Binus Edupark Semarang
© ATMODJO

However, the openable windows and secondary breeze block skin mean that on cool and breezy days, the windows can be opened instead of using the air conditioning full time. In addition, the secondary skin enables smaller BTU's to be used to provide air conditioning for the classrooms.


Binus Edupark Semarang
© ATMODJO
Binus Edupark Semarang
© ATMODJO


Binus Edupark Semarang
Plan - Masterplan
Binus Edupark Semarang
Plan - Third floor
Binus Edupark Semarang
Plan - Ground floor
Binus Edupark Semarang
Plan - Ground floor


Binus Edupark Semarang
Plan - Second floor
Binus Edupark Semarang
Plan - Second floor
Binus Edupark Semarang
Plan - Roof
Binus Edupark Semarang
Plan - Roof


Binus Edupark Semarang
Section
Binus Edupark Semarang
Section
Binus Edupark Semarang
Elevation
Binus Edupark Semarang
Elevation

Denton Corker Marshall
T +61 3 90123600
Denton Corker Marshall
Level 19/55 Collins St, Melbourne VIC 3000, Australia