Kleboth und Dollnig ZT GmbH

Parking Structure Tyrolean Festival

Parking Structure Tyrolean Festival

Parking Structure Tyrolean Festival

Kleboth und Dollnig

AREA
1,000,000 +

YEAR
2012

LOCATION
Mühlgraben, Austria

TYPE
Transport + Infrastructure › Parking

An elegant entrée for the new festival district:The new festival parking garage is the final component in the repositioning of the Tyrolean Festival Erl.

Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival

The new parking garage with 430 parking spaces on three levels is built not far from the famous Passionsspielhaus and the spectacular new Winter Festival Hall.

Due to the geometry of the terrain the parking garage does not need any ramps.

Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival

Each parking level has a separate entry and exit.Individual levels can be opened and closed depending on the demand.

The building defines by its presence the transition between landscape (green meadows where cows graze) and the village of Erl.

Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival

Seen from the south it is very carefully embedded in the landscape, from the north,however, it is clearly visible. 

Here, the garage becomes a stage for the festival guests.

Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival

When exiting the garage, visitors enter a gallery overlooking the Inn valley. The festival houses come only gradually into view.


Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival
Parking Structure Tyrolean Festival

Kleboth und Dollnig ZT GmbH
T +43 732 775584 F +43 732 775584 88
Kleboth und Dollnig ZT GmbH
Peter-Behrens-Platz 2 4020 Linz, Austria