EUITI University School-Mines

EUITI University School-Mines

EUITI UNIVERSITY SCHOOL- MINES

Acxt

ARCHITECTS
Acxt

STATUS
Built

YEAR
2011

LOCATION
Bilbao, Spain

TYPE
Educational › University

Located on the Technological Campus of the University of the Basque Country (UPV/EHU) in Bilbao, this new building is in-keeping with the remodelling of the University Campus within the “Campus ofInternational Excellence Program”, nominated by the Ministry of Education in 2010 in collaboration with the Université de Bordeaux(France).

EUITI University School-Mines
EUITI University School-Mines

Due to the university’s request and to its strategic location within the city, it is intended for this new building, which houses the Mining, Civil and Industrial Technical Engineering Schools, to become an architectonic reference thanks to its image by introducing a modern, quality design in line with the Institution it represents.

EUITI University School-Mines

For this purpose, apart from a very careful volumetric composition which deals with the volume restrictions imposed by the Development Plan, the logo designed by Eduardo Chillida has been included in the façade design, in the perforated steel and golden double skinned one, to be more precise.

EUITI University School-Mines
EUITI University School-Mines

Being a large size and scale building in the city, with almost 45,000 built sq. meters and 10 stories high, the new building sets up a dialogue between architecture, its sculptural volume and its plastic one, represented by the UPV/EHU logo, created by Eduardo Chillida, which was designed with the authorization of his Foundation.

EUITI University School-Mines

The exterior skin of golden perforated plate integrates the Chillida logo and grants unity to the whole building, camouflaging its great size.

Furthermore, the building, being detached, seems divided by the black breach that separates the two university schools.

EUITI University School-Mines
EUITI University School-Mines

Throughout the whole design process, special emphasis was put in resolving the building as functional and flexible a manner as possible.

Hence, two longitudinally functional corridors between supporting walls have been allocated along the long façades.

EUITI University School-Mines

One of them, the ortheast facing one, shelters the classrooms and laboratories. The other, facing southwest and with smaller and more controlled openings, lodges all the offices.

In the centre of the building there is a core of communication nuclei, toilets, building services and a patio for lighting urposes, with orange coloured polycarbonate.

EUITI University School-Mines
EUITI University School-Mines
EUITI University School-Mines

In total, the building has 56 classrooms, 27 seminars, 7 study rooms, 238 offices for teachers, 9 meeting rooms, 45 teaching laboratories and 26 research laboratories apart from areas for managements, administration and services (auditoriums, board rooms, library, cafeteria, dining rooms, postgraduate classrooms, facilities and offices for technicians, etc.)

All the building services have been designed taking energy efficiency into account, and they have been engineered so that future maintenance investment is kept to a minimum.

EUITI University School-Mines
EUITI University School-Mines

Plus, bioclimatic criteria have been present during their design, as well as in the architectonic one, thus enhancing energy saving.

Thus, the use of a rain water reuse system, sustainable lighting criteria, aero thermal considerations and the installation of low temperature boilers will allow for CO2 emissions to be reduced by almost 900,000 kg per year and a substantial saving in energy costs


EUITI University School-Mines
EUITI University School-Mines