
Gönyű Port Control Building
ARCHITECTS
Sporaarchitects-térhálózat
ARCHITECTS
Ádám Hatvani, Attila Korompay, Tibor Dékány
CLIENT
Northern Transdanubian Water Directorate
VISUALISATON
Bence Várhídi
CURTAIN WALLS
Schüco International KG.
GENERAL DESIGN
Sbs-komir Kft; András Benedek
BUDGET
$10k - 50k
ENERGY NEEDS
66,5 Kwh/m2a
STRUCTURAL DESIGN
Ceos Kft.
LANDSCAPE DESIGN
Vk Studio Kft.
ELECTRICAL DESIGN
Hap Kft; Wtf Kft.
FLOOR COVERINGS
Dlw Flooring Gmbh.
STEEL STRUCTURE
Weinberg’93 Építő Kft.
BRISE-SOLEIL SURFACES
Nagév Rács Kft.
HVAC
Kristályklíma Plusz Kft.
FURNITURE
Fa-feri Kft.
PHOTOGRAPH
Balázs Danyiin The Middle Of The Path Where The North And The Black Sea Meet, At The 1,794 Km Mark Of The Danube River And The Mosoni-danube Estuary Between Győr And Gönyű, Along Highway 1, The Győr-gönyű National Public Port Was Constructed, Serving As A Freight Logistics Centre.
AREA
3000 Sqft - 5000 Sqft
AREA
708 Sqm
YEAR
2017
LOCATION
Győr-gönyű National Public Port, Hungary
TYPE
Industrial › Water Facility
The design of the port control building was inspired by the strict system of port infrastructure and the riverbank overlooking the harbour as well as the vigorous movement of the water on the other side of the river.
The service building acts as a multifunctional port inspection unit, including a communication system with the barges in the river, boats for disposing and storing waste and hazardous materials, car storage, offices, water quality test labs, meeting rooms and guest rooms.
The ground floor of the building precisely follows the east-west direction of the railway transport system.
The ground floor is reinforced with a concrete frame, through which the anchoring elements of the cantilever steel staircase can be crossed.
There is a glass structure extending over the road to the river side, allowing the user to supervise the work in the harbour, as well as providing a panoramic view of the natural scenery provided by the surrounding area. The ground level office section is where the workers are located, but additional roof top gardens and terraces are provided on the exterior.
The building is divided according to the function. On the ground floor, in a wedge perpendicular to the shore, there are offices, guest rooms, executive offices and a meeting room, parallel to the river.
All functions are directly accessible from the lobby.
The elevated floor is surrounded by a sun-shaded side of the building as well as a south-facing shading system that can be opened on both sides of the meeting room.
The shaded galvanised surface of the shade under the changing light conditions puts the building in a different garment.
Implementation of modern technology in the design makes the building highly efficient in both energy and labour.The heat and electricity of the building is controlled by environment-aware technologies.
When filling the partition, the soil was placed and the photovoltaic system makes the building self-maintained as stored rainwater is used to keep the roof garden alive.
A communication antenna tower was implemented on the south side of the building, allowing for workers to better cooperate with each other but more specifically making communication between the building and the harbour easier.
