
Footbridge over Ripoll River
ARCHITECTS
Infraestructures De Muntanya, Jbp Enginyeria
PROJECT MANAGEMENT
Álvaro Sainz
STRUCTURE
Jbp Enginyeria, Otherstructures
TECHNICAL PLANNERS
Bac Engineering Consultancy Group
CONSTRUCTION
Infraestructures De Muntanya
YEAR
2022
LOCATION
Spain
CATEGORY
Bridges
Text description provided by architect.
The hanging metal footbridge connects the Molí Vermell wetlands and the urban center on the right bank of the Ripoll River with the Castell de Barberà and the green ring of the municipality on the left.
There are 84 meters of distance between pillars, 2 meters of free width and the pine wood deck reaches up to 5 meters of free height with respect to the river.
The accesses are concrete ramps and remain integrated between the vegetation and topography of the environment.
