Vienna West High School

Vienna West High School
© Kurt Kuball

VIENNA WEST HIGH SCHOOL

F+P Architekten, SHIBUKAWA EDER Architects

ARCHITECTS
F+P Architekten, SHIBUKAWA EDER Architects

CLIENTS
BIG Bundesimmobiliengesellschaft

DESIGN TEAM
Misa Shibukawa, Raphael Eder, Martin Schrehof, Caroline Heidlauf, Noriko Yamazakio

LANDSCAPE
SHIBUKAWA EDER Architects, idealice

MANUFACTURERS
AutoDesk, Eternit, Forbo Flooring Systems

PHOTOGRAPHS
Kurt Kuball

ENGINEERING
RWT plus ZT GmbH

AREA
12483 m²

CATEGORY
High School, Renovation

YEAR
2018

LOCATION
Viena, Austria

Text description provided by architect.

A former military barrack was converted into a modern high school. Half of the main building was demolished and extended with a terraced building around a central courtyard.

Vienna West High School
© Kurt Kuball
Vienna West High School
© Kurt Kuball
Vienna West High School
© Kurt Kuball

The courtyard offers various seating areas for relaxing and learning outside the classrooms.

The entire school was designed to be open and bright. The new transparent main entrance in the historical façade invites the view into the green courtyard.

All the communication areas are situated around the courtyard with room-high windows, which allow direct connection to the outside with plenty of natural light.

Vienna West High School
© Kurt Kuball
Vienna West High School
© Kurt Kuball

As a contrast all the classrooms are located along the outer façade with horizontal windows to create quiet atmosphere to concentrate on classes.

Modern room concept allows different teaching approaches. While the junior classes are taught in clusters on the ground floor, the senior classes are organized according to the department system on the first floor.

Vienna West High School
© Kurt Kuball
Vienna West High School
© Kurt Kuball
Vienna West High School
© Kurt Kuball

The students have their own lounges, so called “Home bases”, which serve as study areas as well as Chill-out areas and social meeting space.

The top floors are for all the students to visit special classes for art and science.

In order to avoid overheating in the summer, a night ventilation system is used for cooling. Electricity is generated by a photovoltaic system on the roof.

Vienna West High School
© Kurt Kuball
Vienna West High School
© Kurt Kuball
Vienna West High School
© Kurt Kuball

The main building is connected to a former horse-riding hall, which were converted into two gymnastic halls with a gallery space. The third gymnastic hall is in the basement of the main building


Vienna West High School
Section A
Vienna West High School
Section B


Vienna West High School
Diagram
Vienna West High School
Diagram


Vienna West High School
North elevation
Vienna West High School
South elevation


Vienna West High School
Ground floor plan
Vienna West High School
First floor plan
Vienna West High School
Second floor plan
Vienna West High School
Third floor plan
Vienna West High School
Site plan