Text description provided by architect.

Located in downtown Toronto, Regent Park is Canada’s oldest and largest social housing project, built in the late 1940’s. The community has historically been planning ills, has contributed to the concentration of a socially marginalized population.

41% of the population living in Regent Park are under 18, and over 70% of the population lives below the Low-Income Cut-Off Rate.

Regent Park Aquatic Centre
© Shai Gil
Regent Park Aquatic Centre
© Shai Gil

The 12 year Regent Park Revitalization project began in 2005 to redevelop the 69 acre community to be a vibrant mixed-use mixed-income community. The Regent Park Aquatic Centre, completed in 2012, is the key civic amenity centred on the eastern flank of the new central park development as the heart of the revitalization.

Regent Park Aquatic Centre has been conceived as a ‘Pavilion in the Park’, very open at the base, and bisected lengthwise by a ‘dorsal fin’ of aquatic hall sky-lighting.

Regent Park Aquatic Centre
© Shai Gil
Regent Park Aquatic Centre
© Shai Gil

It is a multi-purpose swimming pool facility that includes a 25m, 6-lane pool, leisure pool, tot pool, hot tub, slide, tarzan-rope, and diving board. Replacing an existing outdoor pool, the project was mandated to capture a feeling of transparency and connection to the outdoors.

The Aquatic Centre is the first facility in Canada to adopt the singular use of universal changerooms, no longer separating males and females, rather common changerooms with private change cubicles; addressing cultural and gender identity issues, while also enhancing the openness, safety, and visibility throughout the complex.

Regent Park Aquatic Centre
© Shai Gil
Regent Park Aquatic Centre
© Scott Norsworthy

The facility also has two double sliding glass doors off the main pool hall for sunbathing access to the park-side terrace.

Responding to the views from the new high-rise towers surrounding the park, the building’s Green Roof is designed as a fifth elevation, integrating with the building features and park setting.

Regent Park Aquatic Centre
© Shai Gil
Regent Park Aquatic Centre
© Scott Norsworthy

In the last three decades, Regent Park has become an immigrant settlement community. As such, the new Aquatic Centre offers a new level of accommodation with the addition of a complete system of aquatics hall screening for those cultural groups interested in privacy swims.

The adoption of this new progressive feature along with the universal change rooms, the combination of fitness, leisure, and therapeutic aquatic uses, and the open and inviting design has greatly increased interest in the City’s aquatic venues. 

Regent Park Aquatic Centre
© Shai Gil
Regent Park Aquatic Centre
Section

This project typifies the design legacy commitment of the Regent Park revitalization program.

The building is both sculptural and urban in its’ resolution as a park pavilion in a religious urban grid.

Regent Park Aquatic Centre
Section
Regent Park Aquatic Centre
Section

The interior design is clean and simple in its’ resolution, open and inviting, and active and fun in use. This facility provides an important civic amenity to a once marginalized neighbourhood.


Regent Park Aquatic Centre
Site Plan

Regent Park Aquatic Centre
Floor Plan

MacLennan Jaunkalns Miller Architects
T +1 416 5936796 F +1 416 5930212
MacLennan Jaunkalns Miller Architects
425 Adelaide St W Level 6, Toronto, ON M5V 3C1, Canada