Regeneration of Taoyuan International Airport Terminal 1

Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates

REGENERATION OF TAOYUAN INTERNATIONAL AIRPORT TERMINAL 1

Norihiko Dan And Associates

SUPERVISION
Sheu Architect And Associate

INTERIOR
Norihiko Dan And Associates

STRUCTURAL ENGINEER
Structure Design Group (Sdg), Kunio Watanabe

CONSTRUCTION ENGINEER
Bes Engineering Corporation

LANDSCAPE
Norihiko Dan And Associates, Bes Engineering Corporation

AIR CONDITIONING
Morries Technology Engineering Co.ltd, Interior\nahsin International Co.ltd, Uichi Inoue Equipment Laboratory

ENGINEER
Uichi Inoue Equipment Laboratory

CONSTRUCTION ARCHITECTURE
Bes Engineering Corporation

DESIGN TEAM
Ming-hsien Wang, Eiji Sawano, Austris Jankovskis, Ralitsa Kafova, Masato Shiihashi, Tadashi Yoshimura

AIR CONDITION
Uichi Inoue Equipment Laboratory, Morries Technology Engineering Co., Ltd. Interior\nahsin International Co., Ltd.

PHOTOGRAPHS
Norihiko Dan And Associates

AREA
15540 M²

YEAR
2013

LOCATION
Dayuan District, Taiwan

CATAGORY
Airport, Renovation

Text description provided by the architects.

Constructed in 1979 by the highly respected Taiwanese structural engineer T. Y. Lin and influenced by Eero Saarinen’s Washington Dulles International Airport, Taiwan Taoyuan International Airport Terminal 1 featured a prestressed structure that was state of the art at the time.

Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates
Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates

However, after thirty years of use, Terminal 1 was operating over capacity and had become outdated well before its time.

The regeneration aimed not only to re-establish a new main gate for the country, but also to expand the terminal to said requirements without tearing down the existing structure. This enabled the project to retain continuity with the past.

Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates
Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates

Thus, it was a rejuvenation plan to amalgamate the old and the new. Old Terminal 1 had been handling an estimated five million passengers annually. However, due to the subsequent rapid growth of passengers, a plan to allow fifteen million annually was required.

In this project, a method was designed to frame the large roof—which contained the outdoor terrace that the visitors could not access— on both wings to widen the space without constructing any new floors, while simultaneously providing a seismic reinforcement to the structure of the existing Terminal 1. That is how the terminal’s characteristic diagonal pillars, which used to line the exterior walls of the former building, were assimilated to its interior.

Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates
Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates

Hence, these pillars were converted to the main element of interior space from that of the exterior.

The rows of roof girders utilize catenary curves and sunshade louver tiles are placed atop to mutually clamp the girders together.

This method of “clamping” provides stability against seismic forces and wind pressure while also presenting the tiled roof of traditional East Asian architecture through modern architectural construction.

Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates
Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates

Since the former terminal exhibited a state of chaos with an intermixing of cars, buses, and taxis, this project made use of a dual layer of traffic lanes, which doubled the capability of traffic processing.

Because these improvements were made in quick response to new circumstances while also utilizing the existing structure, the building cost as well as the construction waste was reduced to one-twentieth when compared to a case that requires demolition and new construction.

Regeneration of Taoyuan International Airport Terminal 1
© Norihiko Dan and Associates


Regeneration of Taoyuan International Airport Terminal 1
Render


Regeneration of Taoyuan International Airport Terminal 1
First Floor Plan
Regeneration of Taoyuan International Airport Terminal 1
Third Floor Plan


Regeneration of Taoyuan International Airport Terminal 1
Site Plan


Regeneration of Taoyuan International Airport Terminal 1
Section


Regeneration of Taoyuan International Airport Terminal 1
Perspective


Regeneration of Taoyuan International Airport Terminal 1
Detail 1
Regeneration of Taoyuan International Airport Terminal 1
Detail 2
Regeneration of Taoyuan International Airport Terminal 1
Detail 3

T +81 3 54401590
Norihiko Dan And Associates
Komiya bldg.1-11-19 Mita Minato-ku Tokyo 108-0073, Japan