Advantech Linkou Campus Phase 1

ADVANTECH LINKOU CAMPUS PHASE 1

J. J. Pan & Partners

Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh

INTERIOR CONSULTANT
Shaper Park Interior Design

DESIGN TEAM
Joshua J. Pan, Jason Chen, Yi-tai Lin, Tien-kai Yang, Shun-lang Wu, Hsin-ha Chen, Chia-wei Ting

BUILDING CONTRACTOR
Chung-lin General Contractors, Ltd. 

MEP CONSULTANT
Yuan Heng Electrical Engineers Office

STRUCTURAL CONSULTANT
Far Exp Engineering Consultants

LANDSCAPE CONSULTANT
JJpan

PHOTOGRAPHER
Vesper W. S. Hsieh

AREA
36600 M²

YEAR
2013

LOCATION
Guishan District, Taiwan

CATEGORY
Office Buildings

Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh

Text description provided by architect.

The Advantech Campus in Linkou consists of four buildings constructed respectively in three phases;

Phase I: Office Building and Intelligent Greenhouse; Phase II: Manufacturing and Distribution Center;

Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh
Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh

and Phase III: Innovative R&D Department and Employee Recreational Center.

The ideas of creating a site axis, placing of central courtyard, distinguishing front from the rear and establishing phases are emphasized in the project to deliver an articulated campus that differs from other typical industrial complexes.

Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh
Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh

The Office Building in phase I contains a technology showroom opened to the public and an office compound to accommodate daily operations.

Building materials used include brick cavity wall, exposed concrete, steel truss, low-E insulated glass and vertical shading panel.

Together they relate the interior functions to the exterior and therefore enhance the liveliness of the façade.

Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh
Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh

Furthermore, an intelligent greenhouse with sun-tracking solar panels installed creates a space enriched with natural lighting through its environmental control system.

The project embedded six systems to establish an intelligent building that serves the users and visitors better.

Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh
Advantech Linkou Campus Phase 1

Such systems include the BEMS system, i-Reception, Mobile Office, Digital Signage, i-Meeting, i-Parking, and i-Security.

The campus aims to obtain a platinum certification in Intelligent Building and a LEED Gold certification, thus achieving the distinction of being the first double-certified building in the country.

Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh


Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh
Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh
Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh
Advantech Linkou Campus Phase 1
© Vesper W. S. Hsieh


Advantech Linkou Campus Phase 1
Detail
Advantech Linkou Campus Phase 1
Detail
Advantech Linkou Campus Phase 1
Detail
Advantech Linkou Campus Phase 1
Detail


Advantech Linkou Campus Phase 1
Detail
Advantech Linkou Campus Phase 1
Detail
Advantech Linkou Campus Phase 1
Detail
Advantech Linkou Campus Phase 1
Detail


Advantech Linkou Campus Phase 1
Section
Advantech Linkou Campus Phase 1
Site Plan