Stodola 21 Renovation

Stodola 21 Renovation
© Jaroslav Kvíz

STODOLA 21 RENOVATION

DOMYJINAK Architects

AREA
335 m²

YEAR
2021

LEAD ARCHITECTS
Petr ŠIKOLA, Václav DVOŘÁK, Jan ČERNOCH, Hana KLAPALOVÁ, Aneta STROUHALOVÁ

PHOTOGRAPHS
Jaroslav Kvíz

LOCATION
Třebešice, Czech Republic

CATEGORY
Adaptive Reuse

Text description provided by architect.

The idea of our design is to revitalize the fragment of the former barn, which is situated in the southern area of the village.

Stodola 21 Renovation
© Jaroslav Kvíz
Stodola 21 Renovation
© Jaroslav Kvíz

Its new main function is to serve as a technical background of a small village, acting as a "modern barn". Old stone walls of the barn were rebuilt to the original height. A new subtle steel structure supports a lightweight hovering roof.

The barn is merged with its natural surroundings. A box with sanitary facilities and an office is inserted inside, rest of the space is used as a parking place for machinery.

Stodola 21 Renovation
© Jaroslav Kvíz
Stodola 21 Renovation
© Jaroslav Kvíz

A service yard is connected to the municipal road through the building. The original stonework with brick vaults and black steel is used as the main material for the building.

The sliding entrance gate is designed as a contrasting wooden structure. The office box is cladded with expanded metal. Pedestrian and roads surfaces are paved with grey concrete pavers.

Stodola 21 Renovation
© Jaroslav Kvíz
Stodola 21 Renovation
© Jaroslav Kvíz

The walls of the barn consist of stonework and brickwork. New vaults above the entrances are made from bricks.

The roof is designed as a steel self-supporting structure, consisting of columns, beams, and bracing.

Stodola 21 Renovation
© Jaroslav Kvíz
Stodola 21 Renovation
© Jaroslav Kvíz

The edge of the roof is approximately at a height of 5 m and laps over the wall for about 1 m, which is protecting the hall from weather conditions. The pair of entrance gates are designed as manually sliding double-leaf.

Inside the building, there is a small brick building of the operator with a size of about 10 x 4 m, height about 3.5 m, cladded with expanded metal.

Stodola 21 Renovation
© Jaroslav Kvíz
Stodola 21 Renovation
© Jaroslav Kvíz

Hall except the operator's facilities is open and ventilated. The facility building is insulated and tempered. The building is connected to the technical infrastructure from the adjacent road.


Stodola 21 Renovation
Elevations
Stodola 21 Renovation
Elevations


Stodola 21 Renovation
Site Plan
Stodola 21 Renovation
Floor Plan
Stodola 21 Renovation
Section