Studio Twenty Seven Architecture

Two Rivers Public Charter School

Two Rivers Public Charter School
© Anice Hoachlander

TWO RIVERS PUBLIC CHARTER SCHOOL

Studio Twenty Seven Architecture

MANUFACTURERS
Accoya, Ecosense, Dayolite, Ultrabase Systems

MEP ENGINEERING
Engenium Group

CIVIL ENGINEERING
Christopher Consultants

PRINCIPLE ARCHITECT
John Burke AIA

DESIGNER
Jacob Marzolf

PROJECT MANAGER
Natalie Mutchler

STRUCTURE ENGINEERS
Ehlert Bryan

IT/AV/SECURITY
Educational Systems Planning

CATAGORY
Elementary & Middle School

LOCATION
Washington, United States

AREA
28414 ft²

YEAR
2020

Text description provided by architect.

Two Rivers Public Charter School is a network of high-performing public charter schools in Washington DC.

Two Rivers Public Charter School
© Anice Hoachlander
Two Rivers Public Charter School
© Anice Hoachlander

The new middle school at Young campus, designed by Studio Twenty Seven Architecture, is a state-of-the-art facility featuring large classrooms, dedicated common space, a full-sized gymnasium, outdoor courts, sun-filled atrium and the signature ‘sitting steps’ in the foyer.

This school serves 6th through 8th graders and is connected to the existing elementary school via an elevated bridge. Special instruction rooms include art, drama, music, Spanish, science lab, and breakout instructional spaces.

The site in which the building is constructed is bound by a tight property line and a 15’ set back. The design had to fit within this space along with vehicular circulation for the students in a creative way.

The use of the cantilevered storefront allows for a welcoming entry and helped us achieve multiple objectives – the covered outdoor seating area protects from inclement weather for the waiting and gathering students before school and a allows for a larger green roof footprint.

Two Rivers Public Charter School
© Anice Hoachlander

It allows for more play space behind the building because the building can cover a portion of the drop off circle, and a more welcoming less intrusive face to the street.

Vertical expansion - the school wanted to ensure future expansion was possible. The design intentionally accommodates additional load capacity for another story for future expansion.

Two Rivers Public Charter School
© Anice Hoachlander

This new addition is located in a designated watershed zone which requires additional stormwater management measures.

In order to meet those requirements, we maximized the green roof by designing a cantilevered corner roof plane, applying a green roof and elevating the multiple VRF mechanical equipment.

Two Rivers Public Charter School
© Anice Hoachlander
Two Rivers Public Charter School
© Anice Hoachlander

Crucial in the project scope included the project budget and schedule development through rigorous value engineering exercises.

Utilization of a CPM method produced a 70-day complete design duration. The project is located in a designated Anacostia Watershed zone which requires additional stormwater management measures. In order to meet the requirements on the tight site, we maximized the green roof of the building by:

Designing a cantilevered corner which maximizes the 2nd floor roof plane. Elevating the multiple VRF mechanical equipment on the roof to allow for maximized green roof plantings. Utilizing permeable outdoor surfaces including the rubberized play surface outdoor play areas and a modular tiled basketball court while still allowing recess program.

Managing storm water from the perimeter of the building and the drop-off drive into the bioretention area at the school’s front circle drop off. Implementing permeable pavers on all walkway surfaces

Two Rivers Public Charter School
© Anice Hoachlander
Two Rivers Public Charter School
© Anice Hoachlander

Cost Saving Measures: For the existing renovation to the elementary school, portions of the existing gym floor were repaired and replaced. Utilized a portion of the existing building for elective classrooms to save cost and work with the program.

The Bridge: Physically connecting the two buildings was arrived at through investigation. It made the most sense for the school programmatically and with the running of infrastructure from the existing building.

The schools share a kitchen and nurse’s suite, so avoiding redundant program saved cost and provided more learning space to the students.

A PEPCO transformer room was located in a portion of the existing building with a utility ductbank which cut through our proposed building footprint.

Two Rivers Public Charter School
© Anice Hoachlander
Two Rivers Public Charter School
© Anice Hoachlander

We performed test borings to verify the location of the ductbank underground and built out foundation around the ductbank to avoid conflicts.


Two Rivers Public Charter School
First Floor Plan
Two Rivers Public Charter School
First Floor Plan


Two Rivers Public Charter School
Second Floor Plan
Two Rivers Public Charter School
Section


Two Rivers Public Charter School
Diagram
Two Rivers Public Charter School
Diagram
Two Rivers Public Charter School
Diagram

Studio Twenty Seven Architecture
T +1 202 9390027
Studio Twenty Seven Architecture
805 15th St NW #430, Washington, DC 20005, United States