Mikkelsen Arkitekter As

DTU Bioengineering Research Building

DTU Bioengineering Research Building
© Hampus Berndtson

DTU BIOENGINEERING RESEARCH BUILDING

Mikkelsen Architects

COLLABORATING ARCHITECT
Link Architects

AREA
6432 m²

PHOTOGRAPHS
Hampus Berndtson

CONSULTING ENGINEERS
Moe

LOCATION
Lyngby, Denmark

YEAR
2019

CATEGORY
Laboratory, University

Text description provided by architect.

DTU Bioengineering is an education and research building that is part of the overall strategy for the expansion of DTU. The building is connected to the existing buildings 224 and 223 and comprises laboratories, research facilities, and teaching facilities. The building acts as a link between the two existing buildings, 223 and 224.

DTU Bioengineering Research Building
© Hampus Berndtson
DTU Bioengineering Research Building
© Hampus Berndtson

Building 224 has been modernised and has undergone an energy renovation, in connection with the new build.

Mikkelsen Architects’ role included architecture services, user processes, preparation of outlines and project proposals, and the main project, and in connection with the execution, managed part of the tender, as well as project follow up and technical inspection.

Building 225’s design reflects DTU’s desire to create transparency between the researchers’ work and the outside world.

The building’s architecture ensures optimal conditions for research, innovation, and knowledge sharing within the institute, and at the same time makes activities in the building visible to internal and external collaborative partners, on a global scale.

DTU Bioengineering Research Building
© Hampus Berndtson
DTU Bioengineering Research Building
© Hampus Berndtson
DTU Bioengineering Research Building
© Hampus Berndtson

The building’s spatial and functional coherence creates a natural flow between laboratories, classrooms, conference rooms, quiet zones, flexible zones and social zones, for researchers and students alike.

By isolating and categorising rooms with particular technical requirements, like cleanliness or security, a greater degree of openness and freedom is achieved, with regards to possible changes in the future.

A close collaboration between the architects and engineers has ensured that complicated technical requirements and operational considerations are met, while social contexts are also bolstered, by establishing spaces for chance and informal encounters.

DTU Bioengineering Research Building
© Hampus Berndtson
DTU Bioengineering Research Building
© Hampus Berndtson
DTU Bioengineering Research Building
© Hampus Berndtson

Building 224 has been converted and renovated, with new GMO laboratory facilities for research and teaching.

The laboratories are cleanrooms with a high cleanliness classification (ISO 6), GMO classification, and also fulfill containment/biosafety requirements (BSL2). Prior to the conversion, environmental remediation and demolition work were carried out.

DTU Bioengineering Research Building
© Hampus Berndtson
DTU Bioengineering Research Building
© Hampus Berndtson

The energy renovation of B224 has now become a standard measure for the future renovation of DTU’s existing building stock. The project is made up of installation-heavy facilities, and research and laboratory facilities.


DTU Bioengineering Research Building
Plan
DTU Bioengineering Research Building
Plan
DTU Bioengineering Research Building
Plan
DTU Bioengineering Research Building
Construction Detail


DTU Bioengineering Research Building
Section
DTU Bioengineering Research Building
Section


DTU Bioengineering Research Building
Diagram
DTU Bioengineering Research Building
Diagram

DTU Bioengineering Research Building
Program Diagram

DTU Bioengineering Research Building
Exploded Axonometric

Mikkelsen Arkitekter As
T +45 7230 2050
Mikkelsen Arkitekter As
Vesterbrogade 95 A, 3. Sal, Dk-1620 Copenhagen V, Denmark