East Extension Center

East Extension Center
© Felipe Fontecilla

EAST EXTENSION CENTER

Arquitectura DESE UC

ARCHITECTS
Arquitectura DESE UC

SANITARY
Instaco - Patricio Moya, Ruz y Vukasovic - Marcelo Toro, Rodrigo Aguilera

LIGHTNING
Catalina Harasic

THEATER
Ramón López Cauly

INDEPENDENT ARCHITECTURE REVISION
Gerardo Sepúlveda

MANUFACTURERS
AutoDesk, KEIM, Isover, Knauf, Budnik, Danosa, Funder Max, INGMAC, Nuprotec, Renner Coatings, Schwarz Haus, Transve

INDEPENDENT ENGINEERING REVISION
Hans Becks

COLLABORATORS
Juan Eduardo Ojeda

EAST EXTENSION CENTRE
Alejandra Carrazana

DESIGN TEAM
Rocío Ballesteros, Macarena Burdiles, Juan Pablo Corral, Mónica Flores, Manola Ogalde, Nicolás Yopo

A LEAD ARCHITECTS
Fernando Pérez Oyarzun, José Quintanilla Chala

ENERGY
Waldo Bustamante, Gonzalo Escobar

CLIENTS
Dirección de Infraestructura UC: Tomás Dalla Porta, Rafael Núñez, Francisco Palacios, Marcela Flores, Álvaro Leiva

EAST CAMPUS ADMINISTRATION
Yasna Mera

ELECTRIC
COBE Ingenieros - Pablo Oyola

PLINTHS AND SHORING
Lucy Magaña, Gonzalo Magaña

CONSTRUCTION
R&R Construcciones Ltda. Alejandro del Puerto, Javier Torres, Rubén Orellana, Aníbal Henríquez

CLIMATE INSTALLATIONS
Manuel Gutiérrez ([email protected])

ACOUSTIC
Absorbe - Verónica Wulf, Roberto Beltrán

AREA
2992 m²

YEAR
2020

LOCATION
Providencia, Chile

CATEGORY
University

The project for the Facade and Covered Courtyard Building of the Eastern Extension Center is part of a larger plan, commissioned in 2013, which proposed to give new life and incorporate new functions to the built complex of the Eastern Campus of the Pontifical Catholic University of Chile.

East Extension Center
© Felipe Fontecilla

The original project belongs to Juan Lyon and Luis Azócar and was built around 1930. Various partial orders were articulated around the original plan. Now was the turn for the Academic Building of the Faculty of Arts and the remodelling of two groups of rooms of the old building.

The fundamental question that accompanied these interventions was how to work with a building close to one hundred years old, whose materiality, brick and concrete, and whose venerable spaces enjoyed considerable appreciation on the part of its users.

For practical reasons and in principle, any stylistic imitation was discarded, which not only would have been difficult to carry out properly but would also be highly dubious as a strategy to intervene with a historic building.

Instead, a material and dimensional sympathy was chosen towards the old building, which combines thick walls of simple masonry, with concrete slabs, columns and arches.

East Extension Center
© Felipe Fontecilla

That became a first rule: the building would basically consist of concrete and brick. The latter would be used in its artisanal version, as in the old walls.

To this material sympathy, we add the use of the same family of measurements from the old building, which are derived from a very rigorous modular grid of 4.20 meters.

East Extension Center
© Felipe Fontecilla
East Extension Center
© Felipe Fontecilla

That mensural resonance established secret bonds of coexistence between the old and the new. The client's order entailed closing the south-east courtyard of the campus with a new building. In that place, the Lyon and Azócar project proposed a wing that was never built.

The Façade Building was conceived as a contemporary version of this wing, respecting the dominant bays and integrating it into the campus circulation system.

East Extension Center
© Felipe Fontecilla
East Extension Center
© Felipe Fontecilla

The project was developed in two phases. The first one, the Facade Building itself, was the initial commission. When this was configured, the courtyard was requested to be covered. This had been closed, for decades, by a metal fence, allowing visual continuity from the interior to the street. We consider that this visual continuity, which was not part of the original project but had been gained over time, should be respected and preserved.

For this reason, the new body was conceived as a building-bridge that allowed total transparency on the first level, saving almost 30 meters of light. A large brick lattice, which dissolves the void-body relationships of the old building, is the dominant element of the façade, which appears as a kind of suspended brick textile.

The courtyard cover was conceived as an autonomous piece, as a kind of four-legged plateau. The access of light and sun was carefully measured to achieve a suitable climate. A semi-translucent folded ceiling enriches and varies the access of light.

East Extension Center
© Felipe Fontecilla
East Extension Center
© Felipe Fontecilla

Although located in a smaller fraction of the campus, the project aspires to a radical transformation of its architectural texture. It generates new continuities avoiding the excessive division of the courtyards, characteristic of its original condition as a school.

The coexistence of the new and the old, as well as that of what is open to the public and what is properly reserved for the university, is not only a harmonious contiguity or a peaceful coexistence.

The pieces that are incorporated into the whole recognize the elements of the past and are seen in them. This gives rise to a kind of new organism in which what comes from the past acquires a new presence and vitality.

East Extension Center
© Felipe Fontecilla


East Extension Center
Section 01
East Extension Center
Section 02
East Extension Center
Section 03
East Extension Center
Section 04


East Extension Center
Lattice Detail
East Extension Center
Scantling


East Extension Center
General Floorplan
East Extension Center
Floor 1 - Building A

East Extension Center
Floor 1 - Building A
East Extension Center
Floor 2 - Building A

East Extension Center
Floor 1 - Building