
Vergilio Ferreira High School
ARCHITECTS
Atelier Central Arquitectos
STRUCTURAL ENGINEERING
Pressuposto– Projectos e Consultoria de Engenharia
ACOUSTICS
Lmsa
SOLID WASTES
Lmsa
MANUFACTURERS
EEE, Navarra
HEALTH AND SECURITY PLAN
Lmsa | Eng.º João Estevão
INTEGRATED SECURITY
Lmsa | Eng.º Joaquim Pereira
LANDSCAPING
Global
CIVIL AND STRUCTURAL ENGINEERS
Pressuposto– Projectos e Consultoria de Engenharia
HVAC
Lmsa | Eng.ª Gabriela Ferreira
ENERGY CERTIFICATION
Lmsa | Eng.ª Gabriela Ferreira
TECHNICAL CONSULTANTS
LMSA – Engenharia de Edifícios, S.A. | LMSA – MAROBAL | Laqre
CONTRACTOR
Construtora Abrantina, S.A. | Lena Engenharia e Construções, S.A. | MRG, S.A.
SUPERVISION
Tecnoplano– Tecnologia e Planeamento, S.A.
COORDINATION
José Martinez Silva, Miguel Beleza
ELECTRICAL INSTALLATIONS
Lmsa | Eng.º Pedro Gonçalves, Eng.ª Sílvie Cruz, Eng.º João Branco, Eng.º Luis Frazão
COLLABORATORS
Fernando Carlota, João Graça, Pedro Rodrigues, Cristina Vieira, David Cachucho, Andreia Sá, Cláudia Barata, Filipe Oliveira
PHOTOGRAPHS
Fernando Guerra | FG+SG
AREA
29266.0 m²
YEAR
2011
LOCATION
Carnide, portugal
CATEGORY
High school
Text description provided by architect.
The intervention focused on the rehabilitation and reorganization of the existing buildings and to introduce a new entrance building, which includes administrative services and is in contact with the buildings that contain the library, spaces for teachers and spaces to welcome parents and guardians.
The spaces dedicated to the permanence of students and academic areas are distributed among the several buildings.
In one of the buildings has been made an extension so that the space dedicated to the experimental arts and sciences could answer to the existing demands.
The links between the different buildings constitute light elements of metal structure coated with golden aluminum profiles.
The convergence of these elements in the entry block allows for answers to the demands of accessibility and generates a strong link between internal and external space.
The effect produced by chaining the profiles around the remains of a fountain near the entrance building creates an environment that highlights the importance of the centrality of the areas that surround it.
