N10-Eiras Sports Facility

N10-EIRAS SPORTS FACILITY

Comoco

N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra

ARCHITECTS
Comoco

ENGINEER
MyOption

CONSTRUCTION BUDGET
€ 200.000,00

PARTNERS IN CHARGE
Luís Miguel Correia, Nelson Mota, Susana Constantino

YEAR
2012

LOCATION
Coimbra, Portugal

AREA
2385.0 m²

CATEGORY
Sports Architecture, Adaptive Reuse

N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra

Our approach to the design of N10-Eiras Indoor Sports Facility was determined twofold: on the one hand by the specific characteristics of the existing industrial pavilion in which we ought to insert our solution.

On the other hand by the brief, which asked for three main areas: reception; changing rooms and showers; and a party room.

One volume was created, organizing the two main areas at both sides of the reception area, which is also where the entrance is located.

N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra

The new volume thus created occupies the entire width of the existing pavilion, and its own width results from the subtraction of the football field from the pavilion’s total length. The building system defines the materialization of the volume.

A porticoed frame made of American pine wood beams and columns creates the basic structure.

The infill of this structure, both in the roof as in the walls, is made through the use of MDF boards, assembled in such a way as to perform both structural and formal roles in the overall construction.

N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra

The raw use of the MDF boards is followed by a straightforward use of white ceramic tiles in the changing rooms and showers, and by the design of the furniture components, which are also made of raw pine wood elements and black lacquered MDF panels.

The layout of the illumination devices was designed in order to accomplish an intense and expressive plasticity out of the volume's formal and material characteristics.

A tunnel-like element pierces the pavilion's existing wall to announce in the outside the entrance to the facility.

N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra


N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra
N10-Eiras Sports Facility
© FG+SG - Fernando Guerra, Sergio Guerra


N10-Eiras Sports Facility
Plan Level 01
N10-Eiras Sports Facility
Plan Level 04
N10-Eiras Sports Facility
General Plan


N10-Eiras Sports Facility
Elevation
N10-Eiras Sports Facility
Elevation


N10-Eiras Sports Facility
Axon
N10-Eiras Sports Facility
Exploded Axon


N10-Eiras Sports Facility
Section
N10-Eiras Sports Facility
Section
N10-Eiras Sports Facility
Section


N10-Eiras Sports Facility
Details
N10-Eiras Sports Facility
Details
N10-Eiras Sports Facility
Furniture Details


N10-Eiras Sports Facility
Sketches
N10-Eiras Sports Facility
Sketches
N10-Eiras Sports Facility
Sketches


N10-Eiras Sports Facility
Sketches
N10-Eiras Sports Facility
Sketches